Normal | wikipedia.org
Normal | wikipedia.org
Weather permitting, intermittent lane reductions on Airport Road between Raab Road and Northtown Road in Normal will begin at 6:00 a.m. on Saturday, October 25, as street resurfacing work gets underway. The project is scheduled to be completed by 7 p.m. on Friday, November 7.
Local access along Airport Road will be maintained during the project, though there may be some daytime interruptions.
Residents can view details of the road closure and traffic impacts using an online map at https://arcg.is/1Lb1Cu2.
Questions regarding the project can be directed to Eric Herbst, Town of Normal Project Engineer, at (309) 454-9744.
The Town of Normal also noted that all its facilities are fully accessible. "If you require assistance or accommodation to access programs, services or events provided by the Town of Normal, please email ADA Coordinator Mark Clinch or call 309-454-9580. The Town of Normal wants all residents to be able to participate equally in Town efforts and initiatives. We welcome your feedback," according to a statement from the town.

Alerts Sign-up